Working details:- 1. foundation: - 2. 0 x 1. 5 mtr ground floor foundation as per boiler drawing. 2. boiler: - boiler unloading at your side shifting, erection and line level, plumbs etc. 3. pipe line: - ibr 40 mm approx 6 mtr non-ibr 50 mm, 40 mm, 25 mm pipe line boiler room. 4. fo tank: - fo tank modification as per j. N. Marshall nome & electric heater etc. New header fabrication & erection. 5. feed water tank: - feed water tank modification as per j. N. Marshall nome. 6. insulation: - 500mm mineral woof, net & aluminium 26 gage sheet for boiler room pipeline. 7. ducting :- boiler main hole size ducting fabrication & erection chimney 8. supply :- 50 mm isolation valve, 40 mm strainer, duplex filter, 40 mm ball valve as per feed water pump line.
MS Self Supported Chimney manufacturer in morbi
9/B , Shyam Ujjawal Estate, Opp. SBI Bank, GIDC Phase-1, Vatva,Ahmedabad -382445,Gujarat (India)